More than 14 years experiences in Mechanical & Piping Engineering (Engineering Design, Construction, Production and Supervision), such : 9 years in Oil & Gas Project as a Mechanical/Piping Design Engineer, 1,5 years in Pulp Machine Project as a Mechanical Construction Engineer and 4 years in Factory & Plantations Company as Factory Assistant/Technical Assistant/Construction Supervisor.
Experiences are spread from Maintenance Engineering, Design Engineering, Construction & Materials Engineering, Operation & Maintenance Supervision.
Experience includes a combination of engineering, construction, maintenance for piping and mechanical equipment (static & rotating) works, cost estimation, supervision & managerial, documentation and material handing & controlling.
Experiences for Piping Engineering design is conceptual project in oil & gas environment. Have intense and diverse interface with Scope of Work , Piping Design System based safety in design, Materials Take off, Equipment Plan Layout, Pipe stress analysis, Piping Plan Layout & Isometric development. Use base knowledge from operation for client consultancy and develop recommendation during design is often exercised. worked are related with many discipline and with multi national environment.
Design Engineering standard is followed by the international standards such API, ASME, ANSI, ASTM, NACE, British Standard, ISO, PIP and the Company standards such of PT Badak NGL Co Piping Specification, Chevron Piping Specification, Flour Engineering Design standards and Petronas Piping Specification and Alstom Power Piping Specification.
Engineering Detailed Design Project Experiences :
Ø Preparing Proposal for Front End Engineering Design (FEED)
Ø Preparing Proposal for Detailed Engineering Design (DED)
Ø Basic Design Review and Evaluation
Ø Prepare Piping Engineering Scope of Work for the project that have been handle.
Ø Site Survey Activities and Counter Check Actual Design Requirement
Ø Prepare Basic Piping Man-hours Estimation for doing the Engineering Design.
Ø Prepare Design Process Equipments Plant Layout based on the Equipment List Data Sheet, P&ID and Standard of the Equipment Plan Arrangement from Clients and Plant Layout Specification.
Ø Prepare Design of Piping Plan Layout Drawings, Piping Section Plan Drawings and isometric drawings
Ø Develop Bill of Materials for Piping based on the Piping Specification from Client and International Standards.
Ø Develop Cost Estimate for Piping materials and construction.
Ø Prepare Construction Piping Scope of Work of the project for easier to construct the from the design.
Ø Prepare deliverable list for Piping/Mechanical Engineering Design
Ø Design of Piping and Mechanical Calculation sheet
Ø Prepare Pipe Support location , pipe span and pipe loops for the new project
Ø Prepare Pipeline design of gas line.
Ø Prepare Piping Tie In List and Piping Line List based on new P&ID.
Ø Prepare equipment data sheet, pumps data sheet, special Items data sheet, valve data sheet
Ø Prepare Design of Piping Plan Layout as follow by the Safety In Design (SID)
Ø Coordination with Vendors and Sub-Contractor related to Technical and Non Technical Issue
Ø Request for Quotation (RFQ) Preparation
Ø Attendant and as Active to explanation on HAZOPS meeting session related to Process Plant Layout and Piping Plan Layout and Piping arrangement as Safety in Design Issue or interface of the existing pipings.
Ø Prepare Presentation and conduct the SECOMA Meeting (Safety Engineering Construction Operation Maintenance and Ad Hoc) each project completions on Phase 2, Phase 3 and Phase 4 with client in any discipline)
Ø Updating the progress measurement each project achievement and completions.
Ø Prepare Narrative report for Piping Engineering activities Projects.
Ø Reports progress activity to Lead Piping Engineer and Project Engineer.
Seminar and Training Experiences :
q OGSP (OIL AND GAS SAFETY PASPORT) TRAINING AT NIOSH Bangi Selangor Malaysia.
certificated no OG004751N . Expired Date : 23 December 2013
q “API 570 PRESSURE PIPING INSPECTOR Certification Course Certified by ITC Skills Development Sdn Bhd Malaysia that held in Batam dated 9 – 16 January 2010. the materials included : API 570, API 571, API 574, API 577, API 578, ASME B31.3, ASME B16.5, ASME V and ASME IX.
q PIPELINE DESIGN, OPERATION AND CONSTRUCTION (Speaker. Dr. Ir. Asep Handayana Saputra, M.Eng) certificated by Oil Institut Batam, that held ini Duri Riau dated 28 – 31 January 2010. The materials included : Basic Pipeline Design, Gas Pipeline System, Pipeline Materials, Pipeline Integrity, Cathodic Protection, Pipeline Construction, Pipeline Operation and Maintenance. The materials included ASME B31.4 & ASME B31.8
q RABQSA Occupational Safety & Health Management System – AS/NZ 4801/OSHAS 18001 Certified by
RABQSA and PT International Standards Certifications Ltd Sydney Australian, that held in Pekanbaru,
dated 8 – 9 March 2009. (Certificate No. OH-09087)
q RABQSA Quality Management Systems – Requirements ISO 9001:2008 Certified by RABQSA and PT International Standards Certifications Ltd Sydney Australian, that held in Pekanbaru, 17 May 2009 (Certificate no. QM-09260)
q Process Piping Engineering ASME B31.3 Certified by DAP Consultants Jakarta, that held in Batam 11 - 23 January 2009
q PDMS (Plant Design Management System) “Basic Introduction, Equipment and Piping” Certified by PT. Side Detail , that held in Batam 11 – 14 January 2009.
q Safety In Designs Training, Certified by PT. Chevron Pacific Indonesia Riau Indonesia, that held in Duri Riau 12 June 2006
q The Training that held by Tripatra - Fluor Daniel Consortium Riau Indonesia, such :
Ø Hazard Identification & JSA (Job Safety Analysis) Training by HES Department ( 17 September 2009)
Ø Fundamental Safety Work Practice (FSWP) by HES Department (2005)
Ø Smith Driving Defensive Course (DDC) by HES Department (2005)
Ø Plant Orientation by HES Department (2005)
Ø Team Building Training by HR Department (2007)
Ø Safe Work at Height Training by HSE Department (2008)
Ø Confined Space Entry by HSE Department (2008)
q The Training that be held by PT. Tolan Tiga Indonesia Medan Indonesia, such :
Ø Engineering Training for Palm Oil Mill Assistant by Engineering Department (Feb 2002)
Ø Leadership & Team Building (Out Bond) by Engineering Department (Feb 2002)
Ø Engineering Training for Palm Oil Mill Assistant by Engineering Department (September 2002)
Ø Engineering Training for Technical/Workshop Assistant by Engineering Department (2003)
Ø Engineering Training for Technical / Workshop Assistant by Engineering Department (2004)
Ø Engineering Training for Technical/ Workshop Assistant by Engineering Department (2005)
q The Training that held by PT. Riau Andalan Pulp and Paper , such :
Ø 5 S Training (House Keeping ) by Training Department (2000)
Ø Loc Out Procedure by Training Department (2000)
Ø Hydraulic for Fiber line Machine Training by Valmet (2000)
q Training that held by PT. BADAK NGL Co Bontang – Indonesia , such :
Ø Job instruction for Shutdown Plant by Loss Prevention Department ( 1996)
Ø First Aid Training by Medical Department (1997)
Ø Fire Drill Training by Loss Prevention Department (1997)
Engineering Sizing Software & Others Computer Software Skill
q Computer Literacy : Office Application - MS OFFICE
: Graphic - BENTLEY MICROSTATION,
- AutoCad,
PDMS
: Simulator - Pipe Stress Analysis
- B31.3 Piping Checklist ,
Professional Experiences
1. Date : 1 June 2011 – Present
Position : Senior Piping Engineer
Assigment : To Work for ALSTOM ASIA PACIFIC SDN BHD,
Engineering Arrangement & Piping Division
Duties and responsibilities
Ø Design review and check the Arrangement Module Design using PDMS. General check for clash point, access man way, maintenance/operation access interface between structure, instrument, mechanical equipment, piping in the PDMS module
Ø Review and Check the General Arrangement Drawings
Ø Review and Check the P&ID.
Ø Review and Check the Instrument and JB's Drawings
Ø Review and Check the System Isometric Layout Drawings
Ø Review and Check the Isometric Drawing
Ø Review and Check the Isometric Line List, Insulation Line List, Piping Interface list refer to Module in PDMS, P&ID, GA and Isometric Drawings,
Ø Review and Pipe Support List, Lisega Support BOM, Lugs and Trunnion List, Stauff Support BOM, Support Secondary Steel BOM refer to Module in PDMS, Pipe Support/hangers Drawings and Stress Analysis Report.
Ø Review and Check the Piping/Hanger Support Drawings (Permanent and Temporary) refer to Pipe Support List, Module in PDMS and Stress Analysis Report.
Ø Review and Check MTO.
Ø Review Structure Steel Drawings refer to Module in PDMS
Ø Coordination with team according to the new issue and others
Ø Report to Arrangement Leader.
All Review and Checker drawings and documents are followed by the Alstom Working Instruction guide line, P&ID and International Standard (ASME, ANSI, ASTM)
2. Date : 3 December 2010 – 31 Mei 2011
Company : PT. PFCE Indonesia (Members of PFC Engineering Sdn Bhd)
Project : PLANT REJUVENATION & REVAMP # 2 PETRONAS GAS BHD
Assigned to : Piping Engineering Section Engineering Department PFCE SDN BHD
– HYNDAI CONSORTIUM KERTEH KEMAMAN MALAYSIA
Classification : Piping Engineer
Duties and responsibilities :
a) Prepare drafts and technical drawings based on technical data and calculations e.g. Piping Design Basis, Equipment Specifications, Pipe Specification, process requirements, access requirements, aesthetic requirements, Line Lists, Instrument Specifications, Specialty Item Lists, Drawing Index’s and other relevant documents provided by Engineers. Produce plot plans, equipment layout and piping plans and layouts.
b) Prepare inputs for civil engineering including identification of rack locations, foundations, access platforms, underground services, pipe supports, structures for elevated equipment and other piping layout requirements.
c) Engineering Disciplines and Fabrication/Construction personnel. Study layout feasibility, resolve design irregularities, prepare isometric drawings for stress analysis.
d) Prepare final layouts and drawings integrating inputs provided by other engineering disciplines. Consult and make recommendations on feasibility of design plans and layouts.
e) Prepare “As-Built” drawings (plot plans, piping GAs, isometrics, etc.) following completion of construction activities.
f) Ensure conformity of designs and layouts in accordance to Company engineering procedures and ISO quality standards. Archive master technical drawings in accordance to Company and quality filing procedures.
g) Perform related duties as and when directed by the direct Sub Lead Piping Engineer
3. Date : 18 February 2010 – 25 November 2010
Company : PT. Dimensi Barumas Perdana
Project : PT. Chevron Pacific Indonesia
Assigned to : PT. Chevron Pacific Indonesia – Facility Management Department
Engineering & Construction Division
Classification : Mechanical Design Engineer (Static, Dinamic & Piping)
Duties and responsibilities
Ø Review Engineering work packages, Process Plant Layout, Piping Plan Layout, Bill of Materials and detail drawings.
Ø Prepare site survey reports and assessment report when funding the not corrected installation in field
Ø As built the Process Plant Layout and Piping Plant Layout before start for new design of new peojects.
Ø Prepare Design Layout of Equipment , Piping , pipeline as follow the Safety in Design (SID)
Ø Responsible to prepare drawings for Process Plant Layout, Piping Plan Layout, Isometric Layout, calculations, Bill of Materials, Tie in list, valve data sheet, pumps data sheet, tank data sheet to be submitted to Client.
Ø Meeting with Client discussion of technical, clarification about activities and deliverable aspect.
Ø Attended weekly project meetings, monthly project management reporting and acting as PIC for the whole project as required by the lead engineer.
Ø Attended HAZOPS meeting with Client to discuss safety design of the routing piping layout, equipment layout, feasibility review of the new project, maintenance access, operations access, Risk Assessment etc
Ø Prepare job safety analysis (JSA) & SOP (Standard Operation Procedure) to clarify activities to assure scope of works.
Ø Prepare piping road crossing design while the piping crossing the road
Ø Prepare Design of Piping Design Layout and Mechanical Equipment for Water Treatment Plant.
4. Date : 27 July 2009 – 31 December 2009
Company : PT. Tripatra – Flour Consortium – Flexible Program Management
Project : PT. Chevron Pacific Indonesia (Sumatra Light North)
Assigned to : PT. Chevron Pacific Indonesia , REM (Reability Engineering
Maintenance) Departement
Classification : Construction Engineer (Piping & Mechanical Structure)
Duties and responsibilities :
Ø Executing coordination and control contractors activities in managing company & contractors activities of facility construction and built in the good communication, system between contractors, me, and Client Project Engineer
Ø Monitor construction activity by spending considerable amount of time in the field and liaison with contractors.
Ø Review contractors SOP (standards operational procedure and JSA (jobs safety analysis) before execution in the field. And ensure steps of working during project execution will done correct ways and follows by SOP and Safety regulations.
Ø Provide technical consultation for facility engineering as review contractor project execution plan.
Ø Work closely with companies representative and other contractor function related to engineering, procurement, construction and QA/QC.
Ø Report and communicate with client representative regarding field problem during execution (change design, additional scope of work)
Ø Witness of hydrostatic test and test pack during project execution
Ø Inspected the existing pipe road crossing of 600 wells in area CMT PT. Chevron Pacific Indonesia (SLN)
5. Date : 23 September 2005 – 31 May 2009
Company : PT. Tripatra – Flour Consortium
Project : Flexible Program Management
Assigned to : PT. Chevron Pacific Indonesia
Classification : Design Engineer (Piping & Mechanical (Static & Rotating))
Duties and responsibilities :
Ø Review Engineering work packages, Process Plant Layout, Piping Plan Layout, Bill of Materials and detail drawings for biding purpose and submission for Approval by BP Migas.
Ø Squad Check drawings with other disciplines and input P&ID design should be meets with project basis and Client needed.
Ø Make the clarification & discussion with client and vendor before execute the final specification. Such of Fiberglass (FRP) Piping, fire water pumps and Fire Water tank, strainer and fire fighting equipments for engineering work package
Ø Prepare site survey reports and assessment report when funding the not corrected installation in field
Ø As built the Process Plant Layout and Piping Plant Layout before start for new design of new projects.
Ø Prepare Design Layout of Equipment , Piping , pipeline as follow the Safety in Design (SID)
Ø Responsible to prepare drawings for Process Plant Layout, Piping Plan Layout, Isometric Layout, calculations, Bill of Materials, Tie in list, valve data sheet, pumps data sheet, tank data sheet to be submitted to Client.
Ø Meeting with Client discussion of technical, clarification about activities and deliverable aspect.
Ø Attended weekly project meetings, monthly project management reporting and acting as PIC for the whole project as required by the lead engineer
Ø Up dating weekly progress measurement and schedule project for control system activities.
Ø Attended HAZOPS meeting with Client to discuss safety design of the routing piping layout, equipment layout, feasibility review of the new project, maintenance access, operations access, Risk Assessment etc
Ø Prepare job safety analysis (JSA) site survey to clarify activities to assure scope of works.
Ø Prepare Pipe Support location, Pipe span and Pipe loops
Ø Prepare piping road crossing design while the piping crossing the road
Ø SECOMA Meeting and Construct Ability review for new design after Engineering worked Package completed.
6. Date : 1 January 2002 – 22 September 2005
Company : PT. TOLAN TIGA INDONESIA (SIPEF N.V. GROUP) Medan.
Assigned to : PT. Agro Muko Crumb Rubber Factory (Jan 2002 – Feb. 2003)
PT Simpang Kiri Plantation Indonesia (March 2003-April 2004)
PT. Bandar Sumatra Indonesia (May 2004 – June 2005)
Rehabilitation and Reconstruction for Aceh. (June 2005 – Sept. 2005)
Classification : Technical Assistant / Mill Assistant/ Project Supervisor
Duties and Responsibilities :
Ø Supervision of SIPEF Fund for Project Rehabilitation and Reconstruction For Aceh After Disaster.
Ø Supervision of the construction of the new project by the contractors ..
Ø Prepare progress weekly, two weekly and monthly report to Main Office in Medan.
Ø Prepare Standard operational procedure for Rubber Factory and Technical Workshop.
Ø Quality Control of the Rubber production such RSS 1, RSS 2, SIR 3CV60, SIR 20 , SIR 10.
Ø Supervision the manpower activity of Rubber Factory and Workshops
Ø Prepare yearly estimate for the next year activity of the Factory & Technical Department.
Ø Assist Factory Manager while the Manager Factory on leave or on duty.
Ø Coordination with marketing department of Head Office about the shipment o the Rubber Product to Buyer.
Ø Check the quantity of the rubber products as per daily estimation of the rubber products.
7. Date : 27 March 2000 – 30 June 2001
Company : PT. PECTECH INDONESIA (MEMBERS OF APRIL GROUP)
Project : Pulp Machine Area (PD 1, PD 2 and PD 3
Assigned : PT. Riau Andalan Pulp and Paper
Classification : Mechanical Engineer
Duties and responsibilities:
As Design engineering jobs:
- Prepare design of monorail for access maintenance for the pumps and as safety design.
- Prepare design of platform for maintenance access and as safety design
- Prepare design of modification for motors casing that have been bad damaged.
- Prepare bill of materials and bill of quantity for new design for additional works.
- Issued projects drawings and revision drawings to sub contractors.
- Controlling the document of project and drawing for Pulp Dryer Department.
As Materials take off jobs:
- Prepare materials purchase list and construction punch list while the materials are not
Provided by the vendors coordination with the Procurement Department.
- Check and issued the vendors materials for Pulp machine projects coordination with
Logistic Department.
- Coordination with vendor persons ( Noss, Voith, ABB Flack, Ahltrom Pumps, Kone Crane
to check and issued materials for the projects.
As per Construction engineering jobs:
- Supervision for the installation platforms, handrail, ladder and monorail.
- Assist supervision of commissioning and start up for Pulp Machine I & 2 Upgrade and New
Pulp Machine 3 Project.
- Coordination with vendor persons for assist the construction Pulp Machine project.
8. Date : 16 October 1998 – 31 October 1999
Company : PT. RADIANT UTAMA
Project : Train H “Technical Department” (Seconded)
Assigned : PT. BADAK NATURAL GAS LIQUIFACTION, Technical
Department, Facilities Engineering Section
Classification : Mechanical Engineer
Duties and Responsibilities:
- Reviewing request for engineering from operation department.
- Preparation, coordination and implementation of complete engineering package with
usually involved feasibility, re-abilities and safety studies.
- Designs and calculations as per International standard, API, ASME, ANSI, ASTM, ANS,
AISC, PT. Badak NGL standard.
- Prepare design of modification P&ID, piping plan and section, and isometric drawings as
per piping specification
- Prepare and as build P&ID
- Prepare Bill of Materials and Bill of Quantity (BM / BQ)
- Prepare cost estimate as per MMS PT. Badak NGL Co.
- Site Engineer for pressure vessels, columns, exchangers, coolers during plant shutdown
and new piping constructions
- Identification of deficiencies for quality control punch list of Train H (LNG Refinery
Plant) expansion project.
9. Date : 4 April 1997 – 15 March 1998
Company : PT. SUPRACO
Project : Train G “Technical Department” (Seconded)
Assigned : PT. BADAK NATURAL GAS LIQUIFACTION, Technical
Department, Facilities Engineering Section.
Classification : Mechanical Engineer
Duties and Responsibilities:
- Reviewing request for engineering from operation department.
- Preparation, coordination and implementation of complete engineering package with
usually involved feasibility, re-abilities and safety studies.
- Designs and calculations as per International standard, API, ASME, ANSI, ASTM, ANS,
AISC, PT. Badak NGL standard.
- Prepare design of modification P&ID, piping plan and section, and isometric drawings as
per piping specification
- Prepare and as build P&ID
- Prepare Bill of Materials and Bill of Quantity (BM / BQ)
- Prepare cost estimate as per MMS PT. Badak NGL Co.
- Site Engineer for pressure vessels, columns, exchangers, coolers during plant shutdown
and new piping constructions
- Identification of deficiencies for quality control punch list of Train G (LNG Refinery
Plant) expansion project.
10. Date : 14 April 1996 – 25 December 1996
Company : PT. CITRA PANJI MANUNGGAL (Members of MEDCO GROUP)
Project : Plant Maintenance Shut Down
Assigned : PT. BADAK NATURAL GAS LIQUIFACTION, Maintenance
Department, Stationary Equipment Section.
Classification : Scheduler / Quality Control for Preventive Maintenance Activity
Duties and responsibilities:
For Maintenance shutdown activities:
- Control daily progress activity for LNG Refinery Plant Shutdown in Train A, B, C , D, E, F, G, H while routine maintenance. Shutdown activity
For Maintenance daily activities:
- Controlling the preventive maintenance activity program for all Plant from PT. Badak NGL Co. The maintenance activity are :
- Controlling cleaning tube cooler, trainer, fin fan cooler, turbine for all Plant
- Controlling the injection grease on the mooring dolphin, loading arm of LNG/LPG deck.
- Controlling remove and reinstall PSV on LNG Refinery Plant and Power Plant.
I must say this blog loads a lot quicker than most. Can you suggest a good internet hosting provider at a reasonable price?
ReplyDeletefire and safety course in chennai
Well Said, you have furnished the right information that will be useful to anyone at all time. Thanks for sharing your Ideas.
ReplyDeletenebosh course in chennai